HOT COMMISSIONING ACTIVITIES OF BOILER (Stoker/AFBC/CFBC/OIL&GAS/HRSG/WHR)

  1. Refractory Dry Out
    1. Fuel feeding & Backing / Curing Period
    2. Natural Cooling Period
  2. Alkali Boil out
    1. Atmospheric Boil Out / Acid Cleaning
    2. Pressure Boil Out
    3. Header end stub cutting & Flushing
  3. Steam Blowing
  4. Safety Valve Setting / Floating
  5. Steam Test @110% MCR

Please review  enclosed sheet  for details commissioning inputs calculation. It will help to get the stock ready for boiler commissioning.