HOT COMMISSIONING ACTIVITIES OF BOILER (Stoker/AFBC/CFBC/OIL&GAS/HRSG/WHR)
- Refractory Dry Out
- Fuel feeding & Backing / Curing Period
- Natural Cooling Period
- Alkali Boil out
- Atmospheric Boil Out / Acid Cleaning
- Pressure Boil Out
- Header end stub cutting & Flushing
- Steam Blowing
- Safety Valve Setting / Floating
- Steam Test @110% MCR
Please review enclosed sheet for details commissioning inputs calculation. It will help to get the stock ready for boiler commissioning.